Skip to content
Cloud & DevOps

Cloud Migration Services for AWS, Azure and GCP

Netofficials moves on-premise servers and legacy hosting to AWS, Azure or Google Cloud using the 6 Rs framework and a phased, rollback-ready process that protects uptime and data integrity throughout.

Conceptual illustration of on-premise servers migrating to AWS, Azure and Google Cloud via a secure data path

Service Overview

What Are Cloud Migration Services and What Does Netofficials Move?

Cloud migration is the process of moving servers, applications, databases, and network infrastructure from on-premise hardware or legacy hosting environments to a managed cloud platform such as AWS, Microsoft Azure, or Google Cloud Platform. Netofficials manages the full scope of that move: assessment, planning, execution, and post-migration stabilisation.

The workloads Netofficials migrates include virtual machines, containerised applications, relational databases (SQL Server, MySQL, PostgreSQL, Oracle Database), NoSQL stores, data warehouses, VPNs, and DNS configurations. Each workload type carries different risk and complexity, so the migration approach is determined by a structured discovery phase before any infrastructure is touched.

Cloud migration is the right choice when on-premise hardware is approaching end-of-life, when scaling costs are unpredictable, or when compliance requirements demand geographic data residency that a managed cloud provider can satisfy. It is not a universal fix: applications with hard dependencies on local hardware or real-time latency requirements below what cloud networking can reliably deliver may need legacy application modernisation before or instead of a direct migration.

Netofficials operates as an assessment-first partner. No migration scope is committed until the existing environment is documented, dependencies are mapped, and a rollback plan is in place.

Flat diagram showing databases, applications, networking and data warehouses migrating to a cloud platform
  • On-premise servers moved to AWS, Azure or GCP
  • SQL and NoSQL databases migrated to managed cloud services
  • VPN and DNS configurations transferred without service interruption
  • Documented rollback plan in place before cutover begins

Cloud Migration Strategies

The 6 Rs of Cloud Migration: Choosing the Right Strategy

Rehost (Lift and Shift)

Rehosting moves existing servers, virtual machines and workloads to AWS, Azure or Google Cloud with no changes to the application code or architecture. It suits businesses that need to exit a data centre quickly, reduce hardware costs fast, or meet a lease deadline before optimising further.

Replatform

Replatforming makes targeted infrastructure changes during migration without rewriting application logic — for example, moving a self-managed MySQL or PostgreSQL instance to a cloud-managed database service such as Amazon RDS or Azure Database. It suits teams that want managed backups, patching and scaling without a full re-architecture project.

Refactor (Re-architect)

Refactoring redesigns an application to use cloud-native services — containers, serverless functions, managed queues or microservices — to improve scalability, resilience or cost efficiency. It suits workloads where the current architecture creates a hard ceiling on performance or where the business needs to reduce long-term operating costs significantly.

Repurchase

Repurchasing replaces a custom or on-premise application with a SaaS product that covers the same function — for example, moving from a self-hosted CRM to a cloud-hosted equivalent. It suits organisations whose internal system no longer justifies its maintenance overhead and where a commercial product meets the functional requirement.

Retire

Retiring decommissions applications or servers that discovery work identifies as redundant, unused or duplicated. It reduces the scope of the migration, lowers licensing and storage costs, and removes attack surface. It suits any migration programme where the application inventory has not been audited recently.

Retain

Retaining keeps specific workloads on-premise or in their current environment because compliance rules, latency requirements or vendor dependencies make migration impractical at this stage. It suits regulated workloads, recently upgraded systems, or applications tied to hardware that cannot yet move. A phased migration plan revisits retained workloads at a defined future point.

Our Process

How a Cloud Migration Runs from Discovery to Optimisation

Discovery and Assessment

Netofficials audits your existing servers, databases, and application dependencies. Your IT lead provides access to inventory data and architecture diagrams. The output is a written assessment covering workload classifications, dependency maps, compliance considerations, and a recommended migration strategy using the 6 Rs framework.

Migration Strategy Selection

Based on the assessment, Netofficials assigns a migration strategy to each workload: rehost, replatform, refactor, repurchase, retire, or retain. Your CTO or operations lead reviews and approves the strategy document. The output is a prioritised migration plan with target platforms across AWS, Azure, or Google Cloud and a defined cutover approach for each workload.

Pilot Migration

Before touching production, Netofficials migrates one non-critical workload to validate tooling, data sync processes, and rollback procedures. Your team runs acceptance tests against the pilot environment. The output is a validated migration runbook, confirmed rollback steps, and a go or no-go decision for full migration.

Full Phased Migration

Workloads move in prioritised batches during agreed off-peak windows. Netofficials uses blue-green deployment cutover, continuous data sync before each cutover, and VPN and DNS migration controls to minimise downtime. Your operations lead monitors each batch. The output is a fully migrated environment with each workload verified against defined acceptance criteria before the next batch begins.

Technology Stack

Platforms, databases and tooling we work with

Cloud Platforms

Amazon Web Services (AWS)
Microsoft Azure
Google Cloud Platform (GCP)

Databases

SQL Server
MySQL
PostgreSQL
Oracle Database
Amazon RDS
Azure SQL Database
Google Cloud SQL

Infrastructure & Containers

Terraform
Docker
Kubernetes
Ansible

Networking & Connectivity

AWS VPC
Azure Virtual Network
Google Cloud VPC
VPN Gateway
AWS Direct Connect
Azure ExpressRoute
Cloud DNS
Route 53

Who This Service Is For

Businesses That Need a Structured Path Off On-Premise Infrastructure

IT Managers Running Ageing Physical or Co-Location Servers

Your hardware refresh cycle is approaching, support contracts are expiring, and maintaining on-premise servers is consuming budget and engineering time that could go elsewhere.

Netofficials assesses your current workloads, maps each to the right migration strategy, and moves them to AWS, Azure or Google Cloud with a phased, rollback-ready plan.

CTOs Facing Compliance Deadlines or Licence Renewals

An upcoming compliance requirement, Oracle or Windows Server licence renewal, or data-residency obligation has made staying on legacy hosting more expensive than moving to managed cloud infrastructure.

You get a documented migration plan, infrastructure provisioned as code via Terraform, and a hypercare period so your team can verify stability before Netofficials hands over.

Operations and Engineering Teams Without In-House Cloud Migration Expertise

Your team manages the existing environment well but has not run a live database or application migration to AWS, Azure or GCP before and cannot afford an uncontrolled cutover.

Netofficials supplies the migration architecture, blue-green deployment cutover process, VPN and DNS transition, and post-migration support so your team is not carrying the risk alone.

FAQ

Questions about cloud migration services

How long does a cloud migration typically take?

Migration duration depends on several factors rather than a fixed calendar. The main variables are the number of workloads being moved, the complexity of interdependencies between applications, the migration strategy chosen for each workload (lift and shift completes faster than refactoring), the volume of data to transfer, and any compliance or security validation steps required. A single-application cloud assessment and migration takes far less time than a full data-centre exit involving dozens of services.

Will there be downtime during the migration?

Downtime can be reduced significantly through phased migration and a blue-green deployment cutover. In a phased approach, workloads move in prioritised batches so production systems remain live throughout most of the project. A blue-green cutover runs the new cloud environment in parallel with the existing infrastructure; traffic switches only after the cloud environment passes validation, and the original environment stays available as a fallback. Residual downtime, if any, is typically confined to a planned maintenance window agreed in advance.

What is lift and shift migration and is it right for us?

Lift and shift, also called rehost, moves an application to the cloud with no changes to its code or architecture. It is the fastest path to cloud infrastructure and suits workloads where the priority is exiting on-premise hardware quickly or where the application is stable and does not need cloud-native optimisation. It is one of the six recognised migration strategies; Netofficials evaluates whether rehost, replatform, or refactoring is the right fit for each workload during the discovery phase.

Can you migrate our existing databases to a cloud-managed service?

Yes. Netofficials migrates SQL Server, MySQL, PostgreSQL, and Oracle Database workloads to managed cloud database services on AWS, Microsoft Azure, and Google Cloud Platform. Managed targets include services such as Amazon RDS, Azure SQL Database, and Cloud SQL. The migration plan covers schema validation, data integrity checks, connection string updates, and a cutover window sized to the volume and replication lag of the source database.

What happens if something goes wrong during the migration?

Every migration Netofficials runs includes a documented rollback plan before any cutover begins. A pilot migration on a non-critical workload validates the process and tooling before production systems move. During the cutover window, the original environment remains intact and reachable so traffic can revert if validation checks fail. After go-live, a hypercare period keeps the migration team on standby to resolve any issues before the project formally closes. See how we work for more on our delivery process.

What factors affect the cost of a cloud migration project?

Cloud migration cost is determined by the number and complexity of workloads, the total volume of data being transferred, the migration strategy applied to each workload (rehost, replatform, or refactor), the number of databases and third-party integrations involved, compliance and security requirements such as HIPAA or PCI-DSS, and the level of post-migration support needed. A cloud cost and architecture review before the project starts gives a more precise scope and helps avoid budget surprises mid-migration.

Start Your Cloud Migration Assessment

Send us your enquiry and a Netofficials engineer will follow up with targeted questions to clarify your infrastructure scope, migration strategy and risk factors before any work begins.